Sting Property
Executive Summary
Executive Summary (overview)
- One-paragraph overview tied to the latest reported drilling results date.
- Estimated probability of advancing to a formal resource.
- Typical ranges for grade, tonnage, mine life, and method mix.
- Cost structure summary and where the project ranks vs peers.
Regional Copper Potential
Sting is located in Canada, North America. The surrounding region has historically demonstrated a high potential for copper endowment and is proximal to other copper properties. Physical setting (moderate elevation, high relief, continental climate) shapes access, seasonality, and operating costs. Geologically, the area is dominated by Basic plutonic rocks, under moderately thick lithosphere with thick sedimentary cover in a Paleozoic Orogen tectonic province—factors that inform both deposit style and development complexity.
Drill Intercepts
Reported results (Copper Equivalent) average very high grade, long, and very deep. The most recent intercepts are benchmarked against a global copper database.
| Date | Intercept (Copper Equivalent) | Grade | Length | Depth |
|---|---|---|---|---|
| 2025-01-14 | 7.14 g/t Copper Equivalent over 0.5 m from 85.7 m | Very High Grade | Very Thin | Moderate Depth |
| 2025-01-14 | 0.32 g/t Copper Equivalent over 54.8 m from 27.0 m | Moderate Grade | Very Thick | Shallow |
| 2025-01-14 | 5.44 g/t Copper Equivalent over 0.6 m from 71.2 m | Very High Grade | Thin | Moderate Depth |
| 2025-01-14 | 6.85 g/t Copper Equivalent over 0.5 m from 81.8 m | Very High Grade | Very Thin | Moderate Depth |
| 2025-01-14 | 2.23 g/t Copper Equivalent over 5.0 m from 81.8 m | High Grade | Thick | Moderate Depth |
| 2025-01-14 | 1.21 g/t Copper Equivalent over 20.4 m from 81.8 m | High Grade | Very Thick | Moderate Depth |
| 2025-01-14 | 0.24 g/t Copper Equivalent over 78.0 m from 13.5 m | Moderate Grade | Very Thick | Very Shallow |
| 2025-01-14 | 0.76 g/t Copper Equivalent over 9.0 m from 22.0 m | Moderate Grade | Very Thick | Shallow |
| 2025-01-14 | 5.25 g/t Copper Equivalent over 0.6 m from 25.7 m | Very High Grade | Thin | Shallow |
| 2025-01-14 | 2.87 g/t Copper Equivalent over 0.5 m from 28.6 m | High Grade | Very Thin | Shallow |
| 2025-01-14 | 1.95 g/t Copper Equivalent over 0.5 m from 33.2 m | High Grade | Very Thin | Shallow |
| 2025-01-14 | 2.00 g/t Copper Equivalent over 0.5 m from 113.9 m | High Grade | Very Thin | Moderate Depth |
| 2025-01-14 | 0.27 g/t Copper Equivalent over 31.1 m from 113.9 m | Moderate Grade | Very Thick | Moderate Depth |
| 2025-01-14 | 1.57 g/t Copper Equivalent over 0.7 m from 120.1 m | High Grade | Thin | Moderate Depth |
| 2025-01-14 | 2.03 g/t Copper Equivalent over 0.6 m from 124.1 m | High Grade | Thin | Moderate Depth |
Resource Potential
Resource Potential (overview)
- Probability estimate of advancing to a formal resource.
- Typical ranges for grade and tonnage with p50 markers.
- Side-by-side histograms vs. a global reference dataset.
- Plain-English guidance on how to interpret uncertainty.
Economic Potential
Economic Potential
- Distribution of NPV across 1,000 discounted cash-flow simulations.
- Expected NPV value with context vs. drill-stage peers.
- Discussion of spread, skew, and scenario tails (upside/downside).
- Explicit assumptions shown for discount rate and commodity price.
Assumption Distributions
Assumption Distributions
- Reserve conversion and mine life distributions.
- Recovery, processing costs, and waste:ore ratio ranges.
- Capex/offsite opex, average production rate, and other drivers.