Rahill-Bonanza JV Property
Executive Summary
Executive Summary (overview)
- One-paragraph overview tied to the latest reported drilling results date.
- Estimated probability of advancing to a formal resource.
- Typical ranges for grade, tonnage, mine life, and method mix.
- Cost structure summary and where the project ranks vs peers.
Regional Gold Potential
Rahill-Bonanza JV is located in Canada, North America. The surrounding region has historically demonstrated a very high potential for gold endowment and is very proximal to other gold properties. Physical setting (moderate elevation, low relief, continental climate) shapes access, seasonality, and operating costs. Geologically, the area is dominated by Metamorphics, under moderately thick lithosphere with thin sedimentary cover in a Archean Shield tectonic province—factors that inform both deposit style and development complexity.
Drill Intercepts
Reported results (Gold) average moderate grade, very long, and very deep. The most recent intercepts are benchmarked against a global gold database.
| Date | Intercept (Gold) | Grade | Length | Depth |
|---|---|---|---|---|
| 2016-01-26 | 1.08 g/t Gold over 8.0 m from 74.0 m | Moderate Grade | Very Thick | Moderate Depth |
| 2016-01-26 | 1.11 g/t Gold over 13.0 m from 160.0 m | Moderate Grade | Very Thick | Moderate Depth |
| 2016-01-26 | 1.05 g/t Gold over 22.0 m from 21.0 m | Moderate Grade | Very Thick | Shallow |
| 2016-01-26 | 0.72 g/t Gold over 24.0 m from 66.0 m | Moderate Grade | Very Thick | Moderate Depth |
| 2016-01-26 | 1.46 g/t Gold over 20.0 m from 266.0 m | High Grade | Very Thick | Deep |
| 2016-01-26 | 1.10 g/t Gold over 45.0 m from 301.0 m | Moderate Grade | Very Thick | Deep |
| 2016-01-26 | 1.25 g/t Gold over 9.0 m from 407.0 m | High Grade | Very Thick | Deep |
| 2016-01-26 | 0.66 g/t Gold over 40.0 m from 11.0 m | Moderate Grade | Very Thick | Very Shallow |
| 2016-01-26 | 1.61 g/t Gold over 8.0 m from 220.0 m | High Grade | Very Thick | Moderate Depth |
| 2016-01-26 | 0.84 g/t Gold over 101.0 m from 253.0 m | Moderate Grade | Very Thick | Deep |
| 2016-01-26 | 1.71 g/t Gold over 17.0 m from 304.0 m | High Grade | Very Thick | Deep |
| 2016-01-26 | 1.12 g/t Gold over 13.0 m from 500.0 m | Moderate Grade | Very Thick | Very Deep |
| 2016-01-26 | 0.81 g/t Gold over 22.0 m from 73.0 m | Moderate Grade | Very Thick | Moderate Depth |
| 2016-01-26 | 0.66 g/t Gold over 81.0 m from 110.0 m | Moderate Grade | Very Thick | Moderate Depth |
| 2016-01-26 | 2.02 g/t Gold over 15.0 m from 176.0 m | High Grade | Very Thick | Moderate Depth |
Resource Potential
Resource Potential (overview)
- Probability estimate of advancing to a formal resource.
- Typical ranges for grade and tonnage with p50 markers.
- Side-by-side histograms vs. a global reference dataset.
- Plain-English guidance on how to interpret uncertainty.
Economic Potential
Economic Potential
- Distribution of NPV across 1,000 discounted cash-flow simulations.
- Expected NPV value with context vs. drill-stage peers.
- Discussion of spread, skew, and scenario tails (upside/downside).
- Explicit assumptions shown for discount rate and commodity price.
Assumption Distributions
Assumption Distributions
- Reserve conversion and mine life distributions.
- Recovery, processing costs, and waste:ore ratio ranges.
- Capex/offsite opex, average production rate, and other drivers.