Nuevo Guintar Property
Executive Summary
Executive Summary (overview)
- One-paragraph overview tied to the latest reported drilling results date.
- Estimated probability of advancing to a formal resource.
- Typical ranges for grade, tonnage, mine life, and method mix.
- Cost structure summary and where the project ranks vs peers.
Regional Gold Potential
Nuevo Guintar is located in Colombia, South America. The surrounding region has historically demonstrated a very high potential for gold endowment and is proximal to other gold properties. Physical setting (very high elevation, very high relief, tropical climate) shapes access, seasonality, and operating costs. Geologically, the area is dominated by Basic volcanic rocks, under thin lithosphere with moderately thick sedimentary cover in a Meso- and Cenozoic Orogen tectonic province—factors that inform both deposit style and development complexity.
Drill Intercepts
Reported results (Gold Equivalent) average low grade, very long, and deep. The most recent intercepts are benchmarked against a global gold database.
| Date | Intercept (Gold Equivalent) | Grade | Length | Depth |
|---|---|---|---|---|
| 2026-06-09 | 1.96 g/t Gold Equivalent over 2.0 m from 147.0 m | High Grade | Moderate Thickness | Moderate Depth |
| 2026-06-09 | 0.38 g/t Gold Equivalent over 22.0 m from 0.0 m | Moderate Grade | Very Thick | Very Shallow |
| 2026-06-09 | 0.74 g/t Gold Equivalent over 5.0 m from 38.0 m | Moderate Grade | Thick | Shallow |
| 2026-06-09 | 0.91 g/t Gold Equivalent over 11.0 m from 65.0 m | Moderate Grade | Very Thick | Moderate Depth |
| 2026-06-09 | 3.58 g/t Gold Equivalent over 3.0 m from 155.0 m | High Grade | Thick | Moderate Depth |
| 2026-06-09 | 4.36 g/t Gold Equivalent over 1.0 m from 235.0 m | High Grade | Thin | Moderate Depth |
| 2026-06-09 | 0.20 g/t Gold Equivalent over 36.0 m from 0.0 m | Low Grade | Very Thick | Very Shallow |
| 2026-06-09 | 1.47 g/t Gold Equivalent over 1.0 m from 47.0 m | High Grade | Thin | Shallow |
| 2026-06-09 | 2.71 g/t Gold Equivalent over 1.0 m from 66.0 m | High Grade | Thin | Moderate Depth |
| 2026-06-09 | 1.88 g/t Gold Equivalent over 1.0 m from 168.0 m | High Grade | Thin | Moderate Depth |
| 2026-06-09 | 10.60 g/t Gold Equivalent over 4.0 m from 177.0 m | Very High Grade | Thick | Moderate Depth |
| 2026-06-09 | 2.27 g/t Gold Equivalent over 1.0 m from 88.0 m | High Grade | Thin | Moderate Depth |
| 2026-06-09 | 1.18 g/t Gold Equivalent over 10.0 m from 102.0 m | Moderate Grade | Very Thick | Moderate Depth |
| 2026-06-09 | 6.58 g/t Gold Equivalent over 5.0 m from 171.0 m | Very High Grade | Thick | Moderate Depth |
| 2026-06-09 | 0.47 g/t Gold Equivalent over 7.0 m from 0.0 m | Moderate Grade | Very Thick | Very Shallow |
Resource Potential
Resource Potential (overview)
- Probability estimate of advancing to a formal resource.
- Typical ranges for grade and tonnage with p50 markers.
- Side-by-side histograms vs. a global reference dataset.
- Plain-English guidance on how to interpret uncertainty.
Economic Potential
Economic Potential
- Distribution of NPV across 1,000 discounted cash-flow simulations.
- Expected NPV value with context vs. drill-stage peers.
- Discussion of spread, skew, and scenario tails (upside/downside).
- Explicit assumptions shown for discount rate and commodity price.
Assumption Distributions
Assumption Distributions
- Reserve conversion and mine life distributions.
- Recovery, processing costs, and waste:ore ratio ranges.
- Capex/offsite opex, average production rate, and other drivers.